Exhaust Fan System for Fire

4 x 18.5kW Exhaust Fan Star-Delta Closed Transition Starting The above panel uses a star-delta closed transition method to start the 18.5kW motor, the one at the bottom right is...

Read More

HMI Rainwater Harvesting System (Update)

Overview For this new rainwater harvesting project, we recommended our client to use a HMI+PLC design. This is because there is an existing Rosemount pressure transmitter that transmits 4-20mA signal...

Read More

Golf Course Irrigation System

Existing Satellite Irrigation System This is a node of the a satellite irrigation system, it basically controls 24 water valves in this area of the golf course. A centralized controller...

Read More

Cooling Tower Filtration System

Cooling Tower Side Stream Filtration Skid This is a cooling tower filtration system for a Data Centre in Singapore. There are 23 Cooling towers in the building and there is...

Read More

Rainwater Recycling System

Rainwater Filter System at Ground Recently, we have been working on rainwater recycling projects in Singapore and this is one of the completed project. Increasingly, rainwater recycling systems will be...

Read More

Genset Synchronizing Panel

Overview Nowadays generators usually come with smart controllers such as Deep Sea Controller (DSC) to enable multiple generators to automatically run in sync with each other. However, for this job...

Read More

Pressurisation Exit Staircase for Fire

Background Recently, we have replaced 8 sets of staircase pressurisation control panel and their remote monitoring panel for a boarding school. This pressurisation staircase system is required by SCDF, used...